Case Study

Abbotswood Apartments

EV Charging Installation
  • Project:
  • Abbotswood Apartments
  • System Type:
  • EV Charging
  • Location:
  • Beaconsfield
  • Charger Make:
  • Easee
Scope

Installation of a full “Passive” infrastructure allowing residents to move over to EV simply without any pain points Partnering with Easee Charging & Mina Billing portal, Future Group provided the most technically advanced solution available for the residential block sector.

Secure Charging

Residents are issued with a personal RFID card providing secure access and personal billing solutions.

Easy Install
Long Lasting
Efficient

Easy to scale

Utlising an Easee-Ready docking station system, our client now has a completely EV ready charging point at low cost.

By pre-installing the infrastructure within the building, and additional charger can be deployed upon demand with the innovative “Plug & Play” technology.. Simply ‘Click’ it in the pre-installed body now installed in the residents bay.

The Charging Robot acts as an intelligent junction box and supports the expansion of multiple charging stations on the same cable.

Installation

The system was installed and commissioned over a nine-day period making the entire car park ‘Futureproofed’ and EV ready.. Speak to one of our team today and find out how simple your transition to EV could be.

Get in touch

101

Load Balancing Units

22

Max kW charge

69

Smaller than other chargers (%)

365

Support